The Terminal Corporation Expands to Chesapeake, Virginia
On August 15, Terminal Warehouse Company and Terminal Transportation Services began operations in Chesapeake, VA (Norfolk).
Our newest warehouse features 178,000 square feet on 21 secured acres. Only 7.5 miles from the Virginia International Gateway gate and 9.5 miles from Norfolk International Terminals, this facility is poised to offer shippers a strategic advantage on the East Coast, backed by 133 years of impeccable service and experience.

The Norfolk, VA warehouse is located at 2034 Atlantic Ave, Chesapeake, VA 23324, and features;
- 178k sq ft of indoor storage
- 16 docks
- 7 drive-ins
- 20+ trailer drops
- Indoor loading
- Rail served by NS (Norfolk Southern)
The Terminal Family has been moving freight since 1893. We’re glad to be putting down roots in Virginia.
East Coast’s Deepest Commercial Shipping Channel
The completion of the Norfolk Harbor project gives Virginia a significant advantage in the increasingly competitive world of international shipping. At 55 feet deep, the channel can accommodate the largest cargo ships serving the Atlantic, including fully loaded vessels, without forcing them to wait for favorable tides or unload part of their cargo elsewhere. The channel is also wide enough for two ultra-large ships to pass safely, helping reduce delays as traffic moves in and out of the port.
That matters well beyond the waterfront. A more efficient harbor can attract additional shipping routes, strengthen Virginia’s position as a distribution hub and support thousands of jobs tied to trucking, rail, warehousing and manufacturing.
The $450 million project was a shared state and federal investment, but its value will ultimately depend on whether the deeper channel translates into more cargo, dependable service and sustained economic activity throughout the region.
The Norfolk Harbor features include:
- 55-foot channel, the deepest on the coast, wide enough for two ultra-large vessels to pass
- Roughly 15% less time at berth
- Rail capacity built out to 2 million TEUs annually, fully operational
- A fifth ULCV berth in 2027, lifting annual capacity to 5.8 million TEUs
- The nation’s sixth-busiest port, with room for additional growth